MR ALBIN A HASTBACKA wrote:
> My question is, if an inprocess verification could be accomplished with
> very little ( < 10%)additional time to build the model, is this a
> feature that the RP users would want.?
>
I think this would be very useful. I have found, however, that much of the
accuracy problems arise after the part is taken off the machine, i.e.,
during post processing.
Steve
-- Steve Farentinos PML, Inc. 201 W. Beach Ave. Inglewood, CA 90302 310 671-4345 310 671-0858 Fax 310 671-1862 BBS
This archive was generated by hypermail 2.1.2 : Tue Jun 05 2001 - 22:40:35 EEST